INTRODUCTION:
The defining feature of Tube and Clamp Scaffolding is its versatility. You can use clamps to connect horizontal tubes and vertical tubes in unlimited combinations. Because of this adaptability, Tube and Clamp Scaffolding complement the ringlock scaffolding in many ways. Some of the more common applications include:
- Joining Ringlock bays together
- Creating building ties to suspend scaffold
- Bracing Ringlock scaffolds
- Closing gaps in platforms
- Creating guardrails in tricky erections
TABLE OF PRODUCTS PARAMETERS:
Place of Origin | China |
Brand Name | HDRL |
Size | 48.3 /48.3 |
Material Standard | EN74/BS1139/AS1576.2 |
Surface Treatment | electro galvanizing /hot dipped galvanization/self-color |
Packaging Detail | PVC bags then on steel pallet |
Delivery Detail | 20-30 days after deposit. |
Basic Components | Double coupler, Swivel coupler, half swivel, putlog coupler, sleeve coupler, board retaining coupler, Girder coupler, joint pin,etc. |
manufacturing | OEM&ODM |
Item No. | Description | Size | Weight (kgs) |
SC001 | Double couplers | 48.3mm | 1.05 |
SC002 | Swivel couplers | 48.3mm | 1.15 |
SC003 | Half swivels | 48.3mm | 0.60 |
SC004 | putlog couplers | 48.3mm | 0.63 |
SC005 | Joint pins | 48.3mm | 1.00 |
SC006 | Sleeve couplers | 48.3mm | 1.10 |
SC007 | Girder Coupler | 48.3mm | 1.45 |
FACTORY PHOTOS:
PRODUCTS PHOTOS:
CERTIFICATION
EXHIBITION PHOTOS
Q1: Are you a factory or trading company?
A: We are a factory specializing in manufacturing all kinds of scaffolding material.
Q2: Where is the loading port?
A: Qingdao port or Tianjin port
Q3: What's the MOQ of the product?
A: Different item has different MOQ. Normally one pallet is preferred.
Q4: What certificates do you have?
A: We have ISO 9001, ISO 14001, CE, SGS, and TUV certification.
Q5: Can I get some samples?
A: Yes, Sample is free, but usually the customer will pay for the shipping cost.
Q6: Do you have an OEM service?
A: Yes. We can provide OEM and ODM services as your requirements.
Q7: How long is the production cycle after ordering?
A: General it is about 20-30 days.
Q8: What is the payment methods?
A: T/T payment is preferred and other payment terms is accepted.